Electricity has become the lifeblood of the modern world, without which the world will come to a virtual standstill. Any sluggishness in the growth of the power sector can throw the region far behind other regions in industrial, economic and social growth. Thus, power has been recognized as one of the key components of infrastructure for a sustained growth of the state economy. Full utilization of other input factors, such as manpower, land including irrigation and capital-related resources heavily depends upon the uninterrupted availability of electricity. Electricity has therefore, become the most essential factor in improving the social conditions and welfare of people.
Over a period of time, energy supply could not have matched with the need of industrial requirement. The major problems faced worldwide are fast depletion of non-renewable energy sources, increasing costs for energy, and inability to create sufficient returns for investment for growth. These problems have created a shortage of power in both quantity and quality. Power sector was mainly treated as a Government business worldwide, considering its importance as a vital infrastructure for the growth of the state. But growth in this sector, however impressive it was, looked insufficient to cope with the impulsive growth in industrial and other sectors.
In UP’s perspective, there had been no substantial augmentation in the state power generation capacity till the 1990s. Power has been the bane of UP’s industry, with the current demand-supply gap widening to almost 3,000 MW. The current demand in the state is estimated at 10,000 MW.
Taking it as a cue, the Government of UP has formulated UP Power Energy Policy 2009 for increasing the role of public private partnership in generation, transmission and distribution, in addition to the work already being carried out under State sector. The Government is slowly but surely inching ahead towards the development of Power sector with the help of private sector through Public Private Partnerships (PPPs), joint ventures, memoranda of understanding and co-generation by sugar mills.

The Government has envisioned to meet out the power demand across the state by the year 2014, and to increase the annual per capita consumption power up to 1000 units, by 2017.  The Government has taken many pro-active measures in Generation, Transmission and Distribution sectors.

GENERATION

During 11th Five year plan, many initiatives have been taken, which include: 
  • Power plants of 600 MW in Rosa and 600 MW in Anpara 'C' (Unit-I) have already been commissioned
  • Several other Power plants of the aggregate of 2430 MW are scheduled to be commissioned by March 2012 which include
    • 2 x 250 MW Harduaganj Extension under state sector
    • 2 x 250 MW Parichha Extension under state sector
    • First 500 MW unit of Anpara ‘D” under state sector
    • 1 x 600 MW Anapara ‘C’ Thermal Extension (Unit-II) under private sector
    • 4 x 82.5 MW Shri Nagar Hydro under private sector
  • Power plant of 450 MW co-generation in sugar mills is being commissioned under private sector.
  • The work for 3x660 MW Bara Thermal Power Project and 2x660 MW Karchhana Thermal Power Project have been entrusted to private developers under case-2 competitive bidding guidelines of GOI. Work is under progress in Bara Thermal Power Project. Work for Karchhana Thermal Power Project is yet to be started.
  • The work for 2x660 MW Meja Thermal Power Project (Allahabad) is also underway in Joint Sector with NTPC and UP Rajya Vidyut Utpadan Nigam Ltd 
By the end of 11th Five Year Plan, it is hoped that the state would get 1500 MW from the state-run projects, 2130 MW from the private sector, 450 MW from MOU route projects and 1242 MW from various projects being implemented by the central agencies.

Under 12th Five year plan (April 2012 - March 2017), the Government of U.P. has planned more than 25000 MW capacity additions. This envisages capacity addition of 6870 MW under State/Joint sector, 5300 MW under Case-2 Projects, 13580 MW under MOU Route, 2756 MW under Case-1, where LOA has been issued and 2000 MW under Case-1, where competitive bidding process is in progress, by which power can be supplied from any power project located in any State of the country.

As on date, bid process for 2x660 MW Jawaharpur Thermal Power Project has already been initiated and RFP has been issued to 17 qualified bidders.  RFQ process for 3x660 MW Dopaha Thermal Power Project has also been started. The selection of Technical Consultant for 2000 MW Yamuna Expressway Thermal Power is also under process. Department will provide land, coal linkage, water linkage and environmental clearance to the developer and power will be purchased on levelised tariff through competitive bidding.

Further, Government of U.P. has signed 13 nos. of MOU(s) for 14030 MW for different projects with the developers mainly M/s Bajaj Hindustan Ltd., M/s Himawat Power Pvt. Ltd., M/s Lanco Anpara Power Ltd., M/s NTPC & with M/s THDC.     
           
TRANSMISSION
At present UP has a transmission network to cater more than 10000 MW of power. To cater the enhanced generation by the end of 11th plan, UP transmission system is being augmented to evacuate 15000 MW of power. Accordingly, transmission development programme has been worked out and number of 765 KV/ 400 KV/ 220 KV/ 132 KV sub-stations and associated transmission lines are under construction.

These include sub-stations of 765 KV (3 in numbers), 400 KV (9 in numbers) along with associated transmission lines under public private partnership model for evacuation of power from 3x660 MW Bara, 2x660 MW Karchhana and 3x660 MW Meja Thermal Power Projects.  In this backdrop, developers have already been selected viz. M/s. Isolux Corsan for package-1 and M/s. Cobra Instalaciones for package-2.  Letter of Intent has been issued for package-2, whereas the same is being issued for package-1. Both the packages would involve investment of approximately Rs.10,000 crores.

Apart from above, sub-stations of 765 KV (2 in numbers), 400 KV (3 in numbers), 220 KV (25 in numbers) and 132 KV (70 in numbers) are to be constructed under State sector.

DISTRIBUTION
In order to improve the performance of the power sector, and for bringing financial and operational independence, besides creating conditions for competitive and self sustainable developments of the power sector, Government of India has enacted “Electricity Act 2003” with effect from June 2003. Govt. of UP has had undertaken an input-based franchisee distribution model in cities like Agra and Kanpur for economizing on power. While the distribution system in Agra has already been handed over to a private partner M/s Torrent Power Ltd. with effect from 01.04.2010, things are moving in a similar direction for Kanpur. The process would soon be rolled out in nine other towns. This will ensure more power supply in quality as well as in quantity.
With an aim to attract more and more companies to participate in open bid for the selection of input based franchisee, UPPCL will provide the following facilities to the prospective distribution franchisee :- 
  • Distribution franchisee can use utilities distribution assets
  • Distribution franchisee can utilize other services of utilities such as testing facility of HT/LT between switching / sub-stations and distribution transformer and/or other technical assets.
  • Utility shall provide inventory of first three months
  • Utility shall ensure the supply of power to the distribution franchisee
  • Utility shall allow distribution franchise to purchase power through open access.

To augment distribution system, 360 numbers of new 33/11 KV sub-station are under construction and 150 numbers are under sanction process.
It is certainly not the end here, the Government is mulling all available options and relentlessly striving hard in making U.P. a power surplus state, to create an industry friendly ambience so as to compete in true sense with all the peer states across the country and also enshrine U.P. among the most developed states within the country and globally as well. The mission may seem difficult but is surely not impossible once the people of the state from all walks of life shall also be determined and join their hands to bolster every initiative taken by the Government for the better future prospects of the state so that the benefits of development may reach the doorsteps of every citizen of U.P.

N.C. Gupta
Dy. Manager (Fin.)

3 comments:

  1. It is really heartening to know that the power crisis in the state of uttar pradesh is in the process of addressal. things are apparently improving and i am sure your this article shall certainly dispel the doubts in the minds of prospective investors about the poor availability of industrial infrastructure. Thanks to udyog bandhu for sharing this information

    ReplyDelete
  2. UP is one of the worst states in terms of electricity supply...
    technoqo.blogspot.in

    ReplyDelete
  3. Dear sir,
    we are glad to introduce ourself a Fly ash bricks

    and blocks , pavers and concrete bricks making machine manufacturer providing complete solutions and meeting your

    requirements of partition wall products .

    we have experience of the recipe used for north east market with all input to make a viable bricks making project as we have installed few sucessfully running plants in the said region .

    feel free to contact us , and if any doubts feel free to revert back

    Regards

    Ravinder kamath
    +91 9007550425

    ReplyDelete